Measurements of electrical installations and lightning protection system

 

Electrical measurements are the final part of each installations. We check if the installation is made according to the regulations.
Regular or periodic inspection of electrical installations must be carried out within a period of no longer than 8 years. The buildings who has rooms with a potentially explosive atmosphere in a period of no longer than 2 years. For residential buildings within a period of not less than 16 years .